Browse all practice questions for the Florida Stormwater, Erosion and Sedimentation Control Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Florida Stormwater, Erosion and Sedimentation Control Practice Exam course image
After checking in with the superintendent, the key next step is to walk the site perimeter to inspect drainage and erosion risksWhat is an important process to follow after checking in with the superintendent?Check pH and turbidity before discharging treated stormwater.Before discharging chemically treated water, what parameters should be tested?Florida Erosion Rules Focus on Measurable ResultsThe erosion and sediment control rules are described as what type of oriented rule?Install erosion control nets from top to bottom to protect soil on slopesWhen installing erosion control nets or blankets, which direction should the work proceed from?Temporary seeding provides rapid erosion coverage on rough graded sites in Florida stormwater managementWhat type of seeding provides quick coverage to reduce erosion on rough graded areas?The primary function of a retention basin in Florida stormwater management is to store stormwater on siteWhat is the primary function of a retention basin?When to document an inspection report in stormwater, erosion, and sedimentation control programsWhen should an inspector write an inspection report?Why a well-point dewatering system often yields clear groundwater on construction sitesWhich type of dewatering system generally produces clear, non-turbid groundwater?Why the job site is the best place for a pre-construction conferenceWhere is the best place to hold a pre-construction conference?Why you should skip recycling yard debris in a swale when managing stormwaterIs recycling yard debris in a swale advisable?
More practice questions

These questions are part of the practice quiz. Start practicing

  • What does BMP stand for in the context of stormwater and erosion control?
  • What dimensions are required for stakes used in silt fence construction?
  • Before reaching what height of the dam should sediments be removed?
  • What initial step should be taken regarding the superintendent upon arriving on site?
  • What is the initial storage capacity required per acre for a temporary sediment trap?
  • Who is primarily responsible for the development of the Stormwater Pollution Prevention Plan (SWPPP)?
  • Which soil particles are classified as causing the most erosion/turbidity problems?
  • What is one major cause of non-compliance?
  • Why is it important to indicate specific areas as critical or sensitive during planning?
  • What kind of management practices reduce sediment damage to off-site areas?
  • What is a stormwater conveyance channel?
  • For how many years must all field inspections, SWPPP documents, and related photos be retained?
  • What is the correct application rate of straw bales per 1000 sq. ft.?
  • Which three slope factors can developers easily manipulate?
  • What is a Stormwater Pollution Prevention Plan (SWPPP) primarily used for?
  • What should the approach be when finding issues during the perimeter inspection?
  • Which of the following is NOT a cause of non-compliance?
  • Which of the following is NOT a process of overland erosion?
  • What is the main goal of retaining runoff on a construction site?
  • What is the function of an underdrain in detention facilities?
  • What type of training is essential for individuals working on erosion and sediment control?
  • Is it true or false that sediments shall be allowed to settle a minimum of 72 hours prior to the removal of the turbidity curtain?
  • How should a permit applicant utilize the Contamination Locator Map?
  • Which option represents a failure to maintain compliance?
  • What must the Operator develop first?
  • What is the sequence to follow when inspecting the perimeter?
  • The maximum spacing between check dams should ensure the bottom of the upstream dam is at the same elevation as what part of the downstream dam?
  • True or False: A diversion or earthen dike must be used to direct stormwater into the temporary slope drain.
  • In what year did the US EPA authorize Florida to implement the NPDES?
  • What is the required depth of a storm inlet sediment trap from the low point of the outlet?
  • What is a key challenge associated with muck soils in terms of erosion control?
  • What is the appropriate time for writing inspection reports?
  • What is the recommended starting point when sodding a slope?
  • A type III floating turbidity curtain can also be used for flow measured in knots. What is the threshold in knots?
  • Which two flocculant chemicals are commonly used to control turbidity on construction sites?
  • Is off-site sedimentation excusable if all BMPs have been installed according to an approved plan?
  • What is the maximum allowable drainage area for a temporary slope drain?
  • What kind of plan is critical for understanding erosion management on the site?
  • Large construction activities disturb what minimum area of land?
  • What methods are used to manage non-stormwater discharges on construction sites?
  • Which of the following is a common soil conditioner used to improve soil structure?
  • True or False: In a sediment basin, baffles are used to increase flow length.
  • Which of the following is a requirement when discharging treated water?
  • Is a linear project defined as a road?
  • Which of the following should be brought for a site inspection?
  • When is it critical to stabilize disturbed areas after final grading?
  • What is one key responsibility of an inspector in erosion and sediment control?
  • For a silt fence drop inlet sediment filter, how deep should the trench be?
  • What is the primary purpose of top-soiling?
  • What are the three major purposes of using riprap?
  • If a Best Management Practice (BMP) is not performing as needed, what action should be taken?
  • What is the maximum drainage area for a temporary sediment trap?
  • What does RUSLE stand for, and what is its use on construction sites?
  • What is the primary purpose of a paved flume?
  • Which tools can be used to determine the cleanup status of a known contamination site?
  • What element is often integrated into designs for sediment control in construction sites?
  • Which term refers to the settling out of soil particles transported by water and wind?
  • Which construction aspect is NOT a function of a detention basin?
  • What is the primary purpose of a sediment basin?
  • How deep should the fabric extend into the trench when constructing a drop inlet sediment filter?
  • What is one of the three purposes of soil roughening?
  • Which of the following is required during the initial site preparation phase?
  • What is the primary purpose of a diversion in stormwater management?
  • What essential aspect must be evaluated to minimize erosion risk during construction?
  • Can you complete the NOI application electronically?
  • Which of the following is NOT a soil conditioner?
  • What is the purpose of the Notice of Intent (NOI)?
  • How many pounds of straw mulch should be applied per 1000 sq. ft.?
  • What should be the focus when preparing the subgrade before top-soiling?
  • For proper functioning, what do well-point and sock/horizontal pump systems require?
  • When sodding a slope, how should the strips be laid?
  • When reviewing plans, what two key elements must be determined regarding water?
  • How can soil erosion be classified?
  • Is it better to fill and compact two feet of fill all at once compared to filling and compacting in 6-inch lifts?
  • When using chemical treatment systems, what key aspect should always be remembered?
  • What is the primary focus of erosion control practices in construction?
  • A sediment basin is required for a drainage area of more than how many acres?
  • What is the primary function of check dams?
  • In the Construction Generic Permit (CGP), which program is emphasized for effective oversight?
  • Which of the following choices indicates a lack of effort to comply?
  • What is the proper method for backfilling and compacting around pipes and structures?
  • The NPDES Generic Permit for Florida in phase II became effective in which year?
  • When walking the job site, which area should you inspect first?
  • What should inspectors be on the lookout for when reviewing the approved plan?
  • In tidal and/or wind and wave conditions, what is the required gap between the bottom of the curtain and the floor of the water body at mean low water?
  • How should the subgrade be prepared to ensure bonding of the topsoil with the subsoil?
  • When should sediment be removed from check dams?
  • What is the minimum distance required from a known contamination source according to the FDEP General Permit for Dewatering?
  • Aluminum sulfate is primarily used as a flocculant to achieve what goal?
  • The height of the dike at the inlet should be equal to the pipe diameter plus how many inches?
  • When constructing a check dam, the center should be how much lower than the outer edges?
  • Can you start clearing land immediately after receiving the NOI and acknowledgment letter?
  • What actions must a permittee take if a pollutant is detected during dewatering operations?
  • Which of the following is a beneficial function of mulch?
  • After how many years is a stand of vegetation considered fully established?
  • What is a conveyance or system of conveyances?
  • What is one of the aims of an effective erosion and sediment control plan?
  • What are the infiltration rates and runoff potential of soils in the Type D hydrologic group?
  • What is the water quality produced by a rim ditch system?
  • To effectively control erosion, what should be done with disturbed areas as soon as possible?
  • What is the first action to take upon arriving at a job site?
  • What is the average usable life of a silt fence?
  • How can velocity reduction of stormwater flows be achieved?
  • Which component is essential in determining the correct dosage for chemical treatments?
  • How long should storage volume be recovered in a retention basin?
  • What are the four principal factors influencing soil erosion?
  • Who qualifies as a Qualified Inspector in stormwater management?
  • Which of the following is a physical effect of erosion and sedimentation?
  • What do you call a person or organization responsible for a construction project?
  • What should be studied to determine when Best Management Practices (BMPs) will be installed?
  • What type of control practices should be applied to protect disturbed areas from off-site runoff?
  • What is the main function of an outlet protection device?
  • All parties involved in the project should understand a copy of what plan?
  • When clearing a site for fill, what should be done with tree and root debris?
  • After what type of event should all inlets and outlets be inspected?
  • What is a critical step to take after applying for the NOI?
  • What is the maximum side slope ratio allowed for a swale?
  • Which of the following are considered critical or sensitive areas?
  • Is it true that a good place for material storage and parking is inside the tree protection zone?
  • What type of erosion involves small channels forming as water flows over land?
  • The RUSLE is primarily used to predict what on construction sites?
  • What should you do with the NOI after obtaining it?
  • What is the maximum height of a check dam allowed?
  • After achieving final stabilization of a site with 70% or greater coverage, how many days do you have to submit a Notice of Termination (NOT)?
  • How far below the top of the embankment must the top of the riser pipe be for a sediment trap?
  • After a major storm event, what should be monitored in detention facilities?
  • What is one of the effects of soil roughening?
  • Under considerable flow conditions, a type III floating turbidity curtain may be used when flow is less than how many feet per second?
  • Can you transfer your Notice of Intent (NOI) to a new contractor?
  • Who has the first responsibility to get a permit?
  • Which of the following is a key consideration in planning development to fit the terrain?
  • Which of the following helps prevent soil erosion and promotes sediment trapping?
  • What must be avoided when placing riprap over geotextile?
  • What is the importance of inspecting control structures after each major storm?
  • What is the key purpose of a detention basin?
  • When is a site considered to have achieved final stabilization?
  • Can the Stormwater Pollution Prevention Plan (SWPPP) exceed Part IV requirements of the CGP?
  • What type of seeding should be performed immediately in areas that are at rough grade for 14 days or more?
  • Anchor lines shall be attached to which of the following?
  • For a site to be in compliance, the BMPs must be?
  • Which of the following is a critical aspect of effective stormwater management in relation to sediment?
  • What is important to designate for communicating concerns about erosion and sediment control?
  • What is the maximum recommended life for a temporary sediment trap?
  • When constructing a retention basin, what should be avoided during the work process?
  • What is the maximum drainage area for an inlet protection device?
  • A floating turbidity curtain is designed to contain sediment-laden water and allow enough time for what to happen?
  • What characteristic defines a designed waterway for stormwater management?
  • What should be done to ensure underdrains are functioning properly?
  • What is a key component in maintaining effective communication on a construction site?
  • What is the first step in inspecting a project?
  • When installing a silt fence, how deep should the trench be?
  • What is the main purpose of a sediment trap?
  • What does the CGP permit allow you to do?
  • Which component is important to increase the effectiveness of a sediment basin?
  • Which practice is critical in maintaining water quality during construction activities?
  • What are the two soil amendments usually required prior to permanent seeding?
  • What is the primary process by which the land surface is worn away?
  • What joint arrangement is recommended when laying sod on a slope?
  • What is the main purpose of Best Management Practices (BMPs) in stormwater management?
  • Which of these causes of non-compliance involves changes in site conditions?
  • What should be checked if there are signs of non-compliance due to poor maintenance?
  • What is the only factor in the Universal Soil Loss Equation that is beyond a developer's control?
  • What is a potential sign of pollutants during dewatering operations?
  • What is one of the biological effects of erosion and sedimentation?
  • Soils in the Type A hydrologic group are characterized by which infiltration and runoff potential?
  • What general practice supports ongoing compliance in stormwater management?
  • What is the minimum distance that effective tree protection should be installed from the trunk?
  • Which of the following is NOT one of the inspector's duties regarding BMPs?
  • What is the significance of the acknowledgment letter received after applying for the NOI?
  • What should runoff velocities be kept at to effectively manage runoff on construction sites?
  • In what scenario is the use of a stormwater conveyance channel essential?
  • Small construction activities typically affect how many acres of total land area?
  • In flowing water, turbidity curtains should be placed parallel to the direction of flow, not which other direction?
  • Which of the following is a major contributor to increased maintenance of stormwater systems?
  • How can changes in site conditions lead to non-compliance?
  • What should the maximum spacing between check dams ensure about their elevations?
  • How many inches of fabric should extend into the ground for silt fence installation?
  • What is the required width of the trench for silt fence installation?
  • Which process helps in managing both erosion and sedimentation during development?
  • Water erosion can be further classified into which types?
  • When inspecting the perimeter, where should you start your inspection?
  • What is considered a construction activity?
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy